AMC1305L25EVM

Mfr. #: AMC1305L25EVM
제조사: Texas Instruments
설명: Data Conversion IC Development Tools AMC1305L25EVM
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: AMC1305L25EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
AMC1305L25EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the ADC type. 3 V to 5.5 V operating supply voltage range Bulk packaging for easy dispensing Texas Instruments is a trusted brand for quality electronics Interface Type: LVDS Compatible with AMC1305. Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

AMC1305L25EVM Image

AMC1305L25EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

AMC1305L25EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: ADC
  • Tool Is For Evaluation Of: AMC1305
  • Operating Supply Voltage: 3 V to 5.5 V
  • Packaging: Bulk
  • Description/Function: Isolated single-channel Delta-Sigma modulator evaluation module
  • Series: AMC1305L25
  • Brand: Texas Instruments
  • Interface Type: LVDS
  • For Use With: AMC1305
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

AMC1305L25EVM

AMC1305L25EVM Specifications

AMC1305L25EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 3 V to 5.5 V.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed LVDS

  • A: What is the For Use With of the product?

    Q: The For Use With of the product is AMC1305.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Data Conversion IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
Top