BQ27421EVM-G1B

Mfr. #: BQ27421EVM-G1B
제조사: Texas Instruments
설명: Power Management IC Development Tools BQ27421EVM-G1B
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: BQ27421EVM-G1B 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ27421EVM-G1B Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Battery Management type. 3.6 V Input Voltage Texas Instruments is a trusted brand for quality electronics Interface Type: USB Compatible with bq27421. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

BQ27421EVM-G1B Image

BQ27421EVM-G1B

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ27421EVM-G1B Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: Battery Management
  • Tool Is For Evaluation Of: bq27421
  • Input Voltage: 3.6 V
  • Description/Function: Evaluation module is a complete evaluation system for the bq2742
  • Series: BQ27421
  • Brand: Texas Instruments
  • Interface Type: USB
  • For Use With: bq27421
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

BQ27421EVM-G1B

BQ27421EVM-G1B Specifications

BQ27421EVM-G1B FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is Battery Management.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 3.6 V.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is USB.

  • A: What is the For Use With of the product?

    Q: The For Use With of the product is bq27421.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
Top