BQ27425EVM-G2B

Mfr. #: BQ27425EVM-G2B
제조사: Texas Instruments
설명: Power Management IC Development Tools BQ27425EVM-G2B
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: BQ27425EVM-G2B 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ27425EVM-G2B Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Battery Management type. 2.8 V to 4.5 V Input Voltage Texas Instruments is a trusted brand for quality electronics Compatible with bq27425-G2B. The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

BQ27425EVM-G2B Image

BQ27425EVM-G2B

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ27425EVM-G2B Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: Battery Management
  • Tool Is For Evaluation Of: bq27425-G2B
  • Input Voltage: 2.8 V to 4.5 V
  • Description/Function: Evaluation module is a complete evaluation system for the bq27425-G2B
  • Series: BQ27425
  • Brand: Texas Instruments
  • For Use With: bq27425-G2B
  • Maximum Operating Temperature: + 85 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

BQ27425EVM-G2B

BQ27425EVM-G2B Specifications

BQ27425EVM-G2B FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Battery Management.

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 2.8 V to 4.5 V

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the For Use With?

    Q: The product For Use With is bq27425-G2B.

  • A: What is the Maximum Operating Temperature of the product?

    Q: The Maximum Operating Temperature of the product is + 85 C.

  • A: At what frequency does the Minimum Operating Temperature?

    Q: The product Minimum Operating Temperature is - 40 C.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
Top