CDCI6214EVM

Mfr. #: CDCI6214EVM
제조사: Texas Instruments
설명: Clock & Timer Development Tools CDCI6214EVM
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: CDCI6214EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
CDCI6214EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Clock Generators type. Frequency range: 100 MHz Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, USB 1.8 V to 3.6 V operating supply voltage range Clock & Timer Development Tools product type 1 of 100 Development Tools as subcategory

CDCI6214EVM Image

CDCI6214EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

CDCI6214EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Clock & Timer Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: Clock Generators
  • Tool Is For Evaluation Of: CDCI6214
  • Frequency: 100 MHz
  • Series: CDCI6214
  • Brand: Texas Instruments
  • Interface Type: I2C, USB
  • Operating Supply Voltage: 1.8 V to 3.6 V
  • Product Type: Clock & Timer Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

CDCI6214EVM

CDCI6214EVM Specifications

CDCI6214EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Clock Generators

  • A: At what frequency does the Frequency?

    Q: The product Frequency is 100 MHz.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is I2C, USB.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 1.8 V to 3.6 V

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Clock & Timer Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
Top