DAC38RF87EVM

Mfr. #: DAC38RF87EVM
제조사: Texas Instruments
설명: Data Conversion IC Development Tools DAC38RF87EVM
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: DAC38RF87EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC38RF87EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the DAC type. 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: USB Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.123787 oz of Unit Weight

DAC38RF87EVM Image

DAC38RF87EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC38RF87EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: DAC
  • Tool Is For Evaluation Of: DAC38RF87
  • Operating Supply Voltage: 5 V
  • Description/Function: Evaluates the DAC38RF87 digital-to-analog converter
  • Series: DAC38RF87
  • Brand: Texas Instruments
  • Interface Type: USB
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.123787 oz

DAC38RF87EVM

DAC38RF87EVM Specifications

DAC38RF87EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is DAC.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 5 V.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed USB

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Data Conversion IC Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.123787 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
Top