DEM-PCM2912EVM

Mfr. #: DEM-PCM2912EVM
제조사: Texas Instruments
설명: Audio IC Development Tools DEM-PCM2912EVM Eval Mod
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: DEM-PCM2912EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DEM-PCM2912EVM Overview

This product is manufactured by Texas Instruments. This device belongs to the Audio type. 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Audio IC Development Tools product type 1 of 100 Development Tools as subcategory

DEM-PCM2912EVM Image

DEM-PCM2912EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DEM-PCM2912EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: E
  • Type: Audio
  • Tool Is For Evaluation Of: PCM2912
  • Operating Supply Voltage: 5 V
  • Brand: Texas Instruments
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

DEM-PCM2912EVM

DEM-PCM2912EVM Specifications

DEM-PCM2912EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Audio

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 5 V

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Audio IC Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
Top