DLPDLCR2000EVM

Mfr. #: DLPDLCR2000EVM
제조사: Texas Instruments
설명: Display Development Tools EVAL KIT DLP LIGHTCRAFTER DISPLAY 2000
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: DLPDLCR2000EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DLPDLCR2000EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules 100 VAC to 240 VAC operating supply voltage range Interface Type: I2C, USB Texas Instruments is a trusted brand for quality electronics Display Development Tools product type 1 of 100 Development Tools as subcategory The product's DLP is Blue Gecko.

DLPDLCR2000EVM Image

DLPDLCR2000EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DLPDLCR2000EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Display Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Tool Is For Evaluation Of: DLP2000
  • Operating Supply Voltage: 100 VAC to 240 VAC
  • Interface Type: I2C, USB
  • Series: DLP2000
  • Brand: Texas Instruments
  • Product Type: Display Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Tradename: DLP

DLPDLCR2000EVM

DLPDLCR2000EVM Specifications

DLPDLCR2000EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 100 VAC to 240 VAC

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is I2C, USB.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Display Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: What is the Tradename of the product?

    Q: The Tradename of the product is DLP.

185 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
Top