DRV-ACC16-EVM

Mfr. #: DRV-ACC16-EVM
제조사: Texas Instruments
설명: Acceleration Sensor Development Tools DRV-ACC16-EVM
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: DRV-ACC16-EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV-ACC16-EVM Overview

This product is manufactured by Texas Instruments. Evaluation Kits This device belongs to the Accelerometer Sensor type. 3.5 V to 5.5 V operating supply voltage range Dimensions of 290 mm x 15 mm Acceleration of 16 g force Texas Instruments is a trusted brand for quality electronics Interface Type: Analog Three sensing axes: Triple Axis The product can operate at a maximum temperature of + 70 C. The minimum operating temperature of this product is - 25 C. Acceleration Sensor Development Tools product type 1 of 100 Development Tools as subcategory

DRV-ACC16-EVM Image

DRV-ACC16-EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV-ACC16-EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Acceleration Sensor Development Tools
  • RoHS: Y
  • Product: Evaluation Kits
  • Type: Accelerometer Sensor
  • Operating Supply Voltage: 3.5 V to 5.5 V
  • Description/Function: Haptic accelerometer measurement tool
  • Dimensions: 290 mm x 15 mm
  • Acceleration: 16 g
  • Brand: Texas Instruments
  • Interface Type: Analog
  • Sensing Axis: Triple Axis
  • Maximum Operating Temperature: + 70 C
  • Minimum Operating Temperature: - 25 C
  • Product Type: Acceleration Sensor Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

DRV-ACC16-EVM

DRV-ACC16-EVM Specifications

DRV-ACC16-EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Kits.

  • A: At what frequency does the Type?

    Q: The product Type is Accelerometer Sensor.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 3.5 V to 5.5 V.

  • A: What is the Dimensions of the product?

    Q: The Dimensions of the product is 290 mm x 15 mm.

  • A: At what frequency does the Acceleration?

    Q: The product Acceleration is 16 g.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is Analog.

  • A: Is the cutoff frequency of the product Sensing Axis?

    Q: Yes, the product's Sensing Axis is indeed Triple Axis

  • A: At what frequency does the Maximum Operating Temperature?

    Q: The product Maximum Operating Temperature is + 70 C.

  • A: Is the cutoff frequency of the product Minimum Operating Temperature?

    Q: Yes, the product's Minimum Operating Temperature is indeed - 25 C

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Acceleration Sensor Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
Top