DRV8432EVM

Mfr. #: DRV8432EVM
제조사: Texas Instruments
설명: Power Management IC Development Tools DRV8432 Eval Mod
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: DRV8432EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8432EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Motor / Motion Controllers & Drivers type. 12 V Input Voltage Output Voltage is 0 V to 52.5 V Output current: 14 A Texas Instruments is a trusted brand for quality electronics Compatible with DRV8432. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

DRV8432EVM Image

DRV8432EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8432EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Boards
  • Type: Motor / Motion Controllers & Drivers
  • Tool Is For Evaluation Of: DRV8432
  • Input Voltage: 12 V
  • Output Voltage: 0 V to 52.5 V
  • Description/Function: Dual full-bridge PWM motor driver
  • Output Current: 14 A
  • Series: DRV8432
  • Brand: Texas Instruments
  • For Use With: DRV8432
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

DRV8432EVM

DRV8432EVM Specifications

DRV8432EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Motor / Motion Controllers & Drivers

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 12 V

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 0 V to 52.5 V

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 14 A

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the For Use With?

    Q: The product For Use With is DRV8432.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
Top