DRV8805EVM

Mfr. #: DRV8805EVM
제조사: Texas Instruments
설명: Power Management IC Development Tools DRV8805EVM
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: DRV8805EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8805EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules Texas Instruments is a trusted brand for quality electronics Interface Type: USB The product can operate at a maximum temperature of + 85 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.160198 oz of Unit Weight

DRV8805EVM Image

DRV8805EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8805EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Tool Is For Evaluation Of: DRV8805
  • Series: DRV8805
  • Brand: Texas Instruments
  • Interface Type: USB
  • Maximum Operating Temperature: + 85 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.160198 oz

DRV8805EVM

DRV8805EVM Specifications

DRV8805EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed USB

  • A: What is the Maximum Operating Temperature of the product?

    Q: The Maximum Operating Temperature of the product is + 85 C.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.160198 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
Top