| Mfr. #: | DRV8844EVM |
|---|---|
| 제조사: | Texas Instruments |
| 설명: | Power Management IC Development Tools DRV8844 Eval Mod |
| 수명 주기: | 이 제조업체의 새 제품입니다. |
| 데이터 시트: | DRV8844EVM 데이터 시트 |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Power Management Specialized type. 8 V to 60 V Input Voltage Output current: 3.5 A Texas Instruments is a trusted brand for quality electronics Interface Type: USB Compatible with DRV8844. The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8844EVM Specifications
A: At what frequency does the Manufacturer?
Q: The product Manufacturer is Texas Instruments.
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Modules
A: At what frequency does the Type?
Q: The product Type is Power Management Specialized.
A: Is the cutoff frequency of the product Input Voltage?
Q: Yes, the product's Input Voltage is indeed 8 V to 60 V
A: At what frequency does the Output Current?
Q: The product Output Current is 3.5 A.
A: What is the Brand of the product?
Q: The Brand of the product is Texas Instruments.
A: What is the Interface Type of the product?
Q: The Interface Type of the product is USB.
A: Is the cutoff frequency of the product For Use With?
Q: Yes, the product's For Use With is indeed DRV8844
A: At what frequency does the Maximum Operating Temperature?
Q: The product Maximum Operating Temperature is + 85 C.
A: At what frequency does the Minimum Operating Temperature?
Q: The product Minimum Operating Temperature is - 40 C.
A: What is the Product Type of the product?
Q: The Product Type of the product is Power Management IC Development Tools.
A: What is the Factory Pack Quantity of the product?
Q: The Factory Pack Quantity of the product is 1.
A: Is the cutoff frequency of the product Subcategory?
Q: Yes, the product's Subcategory is indeed Development Tools