DS125DF111EVM

Mfr. #: DS125DF111EVM
제조사: Texas Instruments
설명: Interface Development Tools 9.8-12.5Gbps Retimer Eval Mod
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: DS125DF111EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DS125DF111EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Retimer type. Bulk packaging for easy dispensing Texas Instruments is a trusted brand for quality electronics Interface Type: Serial Compatible with DS125DF111. 3.3 V operating supply voltage range Interface Development Tools product type 1 of 100 Development Tools as subcategory

DS125DF111EVM Image

DS125DF111EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DS125DF111EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Interface Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Retimer
  • Tool Is For Evaluation Of: DS125DF111
  • Packaging: Bulk
  • Description/Function: Dual channel retimer with integrated signal conditioning
  • Series: DS125DF111
  • Brand: Texas Instruments
  • Interface Type: Serial
  • For Use With: DS125DF111
  • Operating Supply Voltage: 3.3 V
  • Product Type: Interface Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

DS125DF111EVM

DS125DF111EVM Specifications

DS125DF111EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Retimer.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is Serial.

  • A: At what frequency does the For Use With?

    Q: The product For Use With is DS125DF111.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 3.3 V.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Interface Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
Top