DS90UB964-Q1EVM

Mfr. #: DS90UB964-Q1EVM
제조사: Texas Instruments
설명: Interface Development Tools DS90UB964-Q1 DESERIALIZER HUB EVAL BOARD
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: DS90UB964-Q1EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DS90UB964-Q1EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the FPD-Link III Deserializer type. The AEC-Q100 Qualification Texas Instruments is a trusted brand for quality electronics Interface Type: I2C 12 V operating supply voltage range Interface Development Tools product type 1 of 100 Development Tools as subcategory 1. 2.313264 oz of Unit Weight

DS90UB964-Q1EVM Image

DS90UB964-Q1EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DS90UB964-Q1EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Interface Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: FPD-Link III Deserializer
  • Tool Is For Evaluation Of: DS90UB96X-Q1
  • Qualification: AEC-Q100
  • Series: DS90UB964-Q1
  • Brand: Texas Instruments
  • Interface Type: I2C
  • Operating Supply Voltage: 12 V
  • Product Type: Interface Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 2.313264 oz

DS90UB964-Q1EVM

DS90UB964-Q1EVM Specifications

DS90UB964-Q1EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is FPD-Link III Deserializer.

  • A: At what frequency does the Qualification?

    Q: The product Qualification is AEC-Q100.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is I2C.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 12 V

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Interface Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 2.313264 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
Top