| Mfr. #: | EM1402EVM |
|---|---|
| 제조사: | Texas Instruments |
| 설명: | Power Management IC Development Tools BQ76PL455EVM |
| 수명 주기: | 이 제조업체의 새 제품입니다. |
| 데이터 시트: | EM1402EVM 데이터 시트 |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Battery Management type. 70 V Input Voltage Output Voltage is 5 V Dimensions of 5.5 in x 3.75 in Texas Instruments is a trusted brand for quality electronics Interface Type: UART The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

EM1402EVM Specifications
A: Is the cutoff frequency of the product Manufacturer?
Q: Yes, the product's Manufacturer is indeed Texas Instruments
A: What is the Product of the product?
Q: The Product of the product is Evaluation Modules.
A: At what frequency does the Type?
Q: The product Type is Battery Management.
A: Is the cutoff frequency of the product Input Voltage?
Q: Yes, the product's Input Voltage is indeed 70 V
A: At what frequency does the Output Voltage?
Q: The product Output Voltage is 5 V.
A: What is the Dimensions of the product?
Q: The Dimensions of the product is 5.5 in x 3.75 in.
A: At what frequency does the Brand?
Q: The product Brand is Texas Instruments.
A: What is the Interface Type of the product?
Q: The Interface Type of the product is UART.
A: Is the cutoff frequency of the product Maximum Operating Temperature?
Q: Yes, the product's Maximum Operating Temperature is indeed + 85 C
A: Is the cutoff frequency of the product Minimum Operating Temperature?
Q: Yes, the product's Minimum Operating Temperature is indeed - 40 C
A: What is the Product Type of the product?
Q: The Product Type of the product is Power Management IC Development Tools.
A: Is the cutoff frequency of the product Factory Pack Quantity?
Q: Yes, the product's Factory Pack Quantity is indeed 1
A: Is the cutoff frequency of the product Subcategory?
Q: Yes, the product's Subcategory is indeed Development Tools