| Mfr. #: | GC5016EVM |
|---|---|
| 제조사: | Texas Instruments |
| 설명: | RF Development Tools GC5016 Eval Mod |
| 수명 주기: | 이 제조업체의 새 제품입니다. |
| 데이터 시트: | GC5016EVM 데이터 시트 |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Up-Down Converters type. Frequency range: 160 MHz 1.8 V, 3.3 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: GUI Compatible with GC101EVM. RF Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

GC5016EVM Specifications
A: Is the cutoff frequency of the product Manufacturer?
Q: Yes, the product's Manufacturer is indeed Texas Instruments
A: What is the Product of the product?
Q: The Product of the product is Evaluation Modules.
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed Up-Down Converters
A: What is the Frequency of the product?
Q: The Frequency of the product is 160 MHz.
A: What is the Operating Supply Voltage of the product?
Q: The Operating Supply Voltage of the product is 1.8 V, 3.3 V.
A: What is the Brand of the product?
Q: The Brand of the product is Texas Instruments.
A: Is the cutoff frequency of the product Interface Type?
Q: Yes, the product's Interface Type is indeed GUI
A: What is the For Use With of the product?
Q: The For Use With of the product is GC101EVM.
A: Is the cutoff frequency of the product Product Type?
Q: Yes, the product's Product Type is indeed RF Development Tools
A: At what frequency does the Factory Pack Quantity?
Q: The product Factory Pack Quantity is 1.
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.