LM5122EVM-1PH

Mfr. #: LM5122EVM-1PH
제조사: Texas Instruments
설명: Power Management IC Development Tools LM5122 EVAL MOD-1PH
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: LM5122EVM-1PH 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LM5122EVM-1PH Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Switching Controllers type. 9 V to 20 V Input Voltage Output Voltage is 24 V Output current: 4.5 A Texas Instruments is a trusted brand for quality electronics Compatible with LM5122. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.029239 oz of Unit Weight

LM5122EVM-1PH Image

LM5122EVM-1PH

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LM5122EVM-1PH Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Switching Controllers
  • Tool Is For Evaluation Of: LM5122
  • Input Voltage: 9 V to 20 V
  • Output Voltage: 24 V
  • Description/Function: Evaluation module provides the design engineer with a fully functional synchronous boost converter
  • Output Current: 4.5 A
  • Series: LM5122
  • Brand: Texas Instruments
  • For Use With: LM5122
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.029239 oz

LM5122EVM-1PH

LM5122EVM-1PH Specifications

LM5122EVM-1PH FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Switching Controllers.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 9 V to 20 V.

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 24 V

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 4.5 A

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the For Use With?

    Q: The product For Use With is LM5122.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.029239 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
Top