LMH3404EVM

Mfr. #: LMH3404EVM
제조사: Texas Instruments
설명: RF Development Tools LMH3404 Evaluation Module
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: LMH3404EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LMH3404EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the RF Amplifiers type. Frequency range: 7 GHz 3.3 V to 5.25 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Compatible with LMH3404. RF Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.610516 oz of Unit Weight

LMH3404EVM Image

LMH3404EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LMH3404EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: RF Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: RF Amplifiers
  • Tool Is For Evaluation Of: LMH3404
  • Frequency: 7 GHz
  • Operating Supply Voltage: 3.3 V to 5.25 V
  • Brand: Texas Instruments
  • For Use With: LMH3404
  • Product Type: RF Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.610516 oz

LMH3404EVM

LMH3404EVM Specifications

LMH3404EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is RF Amplifiers.

  • A: At what frequency does the Frequency?

    Q: The product Frequency is 7 GHz.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 3.3 V to 5.25 V.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product For Use With?

    Q: Yes, the product's For Use With is indeed LMH3404

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is RF Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

  • A: Is the cutoff frequency of the product Unit Weight?

    Q: Yes, the product's Unit Weight is indeed 0.610516 oz

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
Top