LMK04610EVM

Mfr. #: LMK04610EVM
제조사: Texas Instruments
설명: Clock & Timer Development Tools EVM FOR LMK04610 ANALOG JITTER CLEANER
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: LMK04610EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LMK04610EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Clock Jitters type. Frequency range: 122.88 MHz Texas Instruments is a trusted brand for quality electronics Interface Type: USB 5 V operating supply voltage range Clock & Timer Development Tools product type 1 of 100 Development Tools as subcategory

LMK04610EVM Image

LMK04610EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LMK04610EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Clock & Timer Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Clock Jitters
  • Tool Is For Evaluation Of: LMK04610
  • Frequency: 122.88 MHz
  • Description/Function: Evaluates the LMK04610 clock jitter cleaner
  • Series: LMK04610
  • Brand: Texas Instruments
  • Interface Type: USB
  • Operating Supply Voltage: 5 V
  • Product Type: Clock & Timer Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

LMK04610EVM

LMK04610EVM Specifications

LMK04610EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Clock Jitters.

  • A: Is the cutoff frequency of the product Frequency?

    Q: Yes, the product's Frequency is indeed 122.88 MHz

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is USB.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 5 V.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Clock & Timer Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
Top