LMT01EVM

Mfr. #: LMT01EVM
제조사: Texas Instruments
설명: Temperature Sensor Development Tools LMT01EVM
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: LMT01EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LMT01EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Temperature Sensor type. 5.5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: 1-Wire The product can operate at a maximum temperature of + 150 C. The minimum operating temperature of this product is - 50 C. Temperature Sensor Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.009008 oz of Unit Weight

LMT01EVM Image

LMT01EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LMT01EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Temperature Sensor Development Tools
  • RoHS: E
  • Product: Evaluation Modules
  • Type: Temperature Sensor
  • Tool Is For Evaluation Of: LMT01
  • Operating Supply Voltage: 5.5 V
  • Description/Function: LMT01 evaluation module
  • Series: LMT01
  • Brand: Texas Instruments
  • Interface Type: 1-Wire
  • Maximum Operating Temperature: + 150 C
  • Minimum Operating Temperature: - 50 C
  • Product Type: Temperature Sensor Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.009008 oz

LMT01EVM

LMT01EVM Specifications

LMT01EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Temperature Sensor.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 5.5 V

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed 1-Wire

  • A: Is the cutoff frequency of the product Maximum Operating Temperature?

    Q: Yes, the product's Maximum Operating Temperature is indeed + 150 C

  • A: What is the Minimum Operating Temperature of the product?

    Q: The Minimum Operating Temperature of the product is - 50 C.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Temperature Sensor Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: Is the cutoff frequency of the product Unit Weight?

    Q: Yes, the product's Unit Weight is indeed 0.009008 oz

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
Top