LMZ21701EVM

Mfr. #: LMZ21701EVM
제조사: Texas Instruments
설명: Power Management IC Development Tools LMZ21701 Eval Mod Board
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: LMZ21701EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LMZ21701EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Regulators - Switching Regulators type. 5 V to 17 V Input Voltage Output Voltage is 3.3 V Output current: 1 A Texas Instruments is a trusted brand for quality electronics Compatible with LMZ21701. The product can operate at a maximum temperature of + 125 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory The product's SIMPLE SWITCHER is Blue Gecko. 1. 3.479 lbs of Unit Weight

LMZ21701EVM Image

LMZ21701EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LMZ21701EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: LMZ21701
  • Input Voltage: 5 V to 17 V
  • Output Voltage: 3.3 V
  • Description/Function: Nano module evaluation board for LMZ21701
  • Output Current: 1 A
  • Series: LMZ21700
  • Brand: Texas Instruments
  • For Use With: LMZ21701
  • Maximum Operating Temperature: + 125 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Tradename: SIMPLE SWITCHER
  • Unit Weight: 3.479 lbs

LMZ21701EVM

LMZ21701EVM Specifications

LMZ21701EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Voltage Regulators - Switching Regulators

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 5 V to 17 V.

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 3.3 V.

  • A: At what frequency does the Output Current?

    Q: The product Output Current is 1 A.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product For Use With?

    Q: Yes, the product's For Use With is indeed LMZ21701

  • A: Is the cutoff frequency of the product Maximum Operating Temperature?

    Q: Yes, the product's Maximum Operating Temperature is indeed + 125 C

  • A: At what frequency does the Minimum Operating Temperature?

    Q: The product Minimum Operating Temperature is - 40 C.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: What is the Tradename of the product?

    Q: The Tradename of the product is SIMPLE SWITCHER.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 3.479 lbs.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
Top