| Mfr. #: | LP5910YKA18EVM |
|---|---|
| 제조사: | Texas Instruments |
| 설명: | Power Management IC Development Tools LP5910YKA18EVM |
| 수명 주기: | 이 제조업체의 새 제품입니다. |
| 데이터 시트: | LP5910YKA18EVM 데이터 시트 |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the LDO Voltage Regulators type. 500 mV to 3.3 V Input Voltage Output Voltage is 1.8 V Output current: 1 mA to 300 mA Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 4 lbs of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LP5910YKA18EVM Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: At what frequency does the Product?
Q: The product Product is Evaluation Modules.
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed LDO Voltage Regulators
A: What is the Input Voltage of the product?
Q: The Input Voltage of the product is 500 mV to 3.3 V.
A: At what frequency does the Output Voltage?
Q: The product Output Voltage is 1.8 V.
A: At what frequency does the Output Current?
Q: The product Output Current is 1 mA to 300 mA.
A: At what frequency does the Brand?
Q: The product Brand is Texas Instruments.
A: Is the cutoff frequency of the product Product Type?
Q: Yes, the product's Product Type is indeed Power Management IC Development Tools
A: At what frequency does the Factory Pack Quantity?
Q: The product Factory Pack Quantity is 1.
A: Is the cutoff frequency of the product Subcategory?
Q: Yes, the product's Subcategory is indeed Development Tools
A: Is the cutoff frequency of the product Unit Weight?
Q: Yes, the product's Unit Weight is indeed 4 lbs