LP8755EVM

Mfr. #: LP8755EVM
제조사: Texas Instruments
설명: Power Management IC Development Tools LP8755 EVAL MOD
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: LP8755EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LP8755EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Regulators - Switching Regulators type. 5 V Input Voltage Output Voltage is 600 mV to 1.67 V Bulk packaging for easy dispensing Output current: 15 A Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, USB Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

LP8755EVM Image

LP8755EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LP8755EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: LP8755
  • Input Voltage: 5 V
  • Output Voltage: 600 mV to 1.67 V
  • Packaging: Bulk
  • Output Current: 15 A
  • Series: LP8755
  • Brand: Texas Instruments
  • Interface Type: I2C, USB
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

LP8755EVM

LP8755EVM Specifications

LP8755EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Voltage Regulators - Switching Regulators

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 5 V.

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 600 mV to 1.67 V.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 15 A

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is I2C, USB.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
Top