MRD2EVM

Mfr. #: MRD2EVM
제조사: Texas Instruments
설명: RFID Transponder Tools Microreader EVAL BRD
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: MRD2EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
MRD2EVM Overview

This product is manufactured by Texas Instruments. Evaluation Kits 2.7 V to 5.5 V operating supply voltage range Frequency range: 134.2 kHz Texas Instruments is a trusted brand for quality electronics Interface Type: SPI, RS232, USB The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. RFID Transponder Tools product type 1 of 100 Development Tools as subcategory

MRD2EVM Image

MRD2EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

MRD2EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: RFID Transponder Tools
  • RoHS: Y
  • Product: Evaluation Kits
  • Operating Supply Voltage: 2.7 V to 5.5 V
  • Description/Function: RFID Evaluation Kit
  • Frequency: 134.2 kHz
  • Brand: Texas Instruments
  • Interface Type: SPI, RS232, USB
  • Maximum Operating Temperature: + 85 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: RFID Transponder Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

MRD2EVM

MRD2EVM Specifications

MRD2EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Kits.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 2.7 V to 5.5 V

  • A: What is the Frequency of the product?

    Q: The Frequency of the product is 134.2 kHz.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is SPI, RS232, USB.

  • A: What is the Maximum Operating Temperature of the product?

    Q: The Maximum Operating Temperature of the product is + 85 C.

  • A: What is the Minimum Operating Temperature of the product?

    Q: The Minimum Operating Temperature of the product is - 40 C.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed RFID Transponder Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

21 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
Top