| Mfr. #: | PCM1864EVM |
|---|---|
| 제조사: | Texas Instruments |
| 설명: | Audio IC Development Tools PCM1864EVM-SW Contr Evaluation Module |
| 수명 주기: | 이 제조업체의 새 제품입니다. |
| 데이터 시트: | PCM1864EVM 데이터 시트 |


This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Audio type. 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: USB Compatible with USB-I2X. Audio IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

PCM1864EVM Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: At what frequency does the Product?
Q: The product Product is Evaluation Boards.
A: At what frequency does the Type?
Q: The product Type is Audio.
A: What is the Operating Supply Voltage of the product?
Q: The Operating Supply Voltage of the product is 5 V.
A: Is the cutoff frequency of the product Brand?
Q: Yes, the product's Brand is indeed Texas Instruments
A: At what frequency does the Interface Type?
Q: The product Interface Type is USB.
A: Is the cutoff frequency of the product For Use With?
Q: Yes, the product's For Use With is indeed USB-I2X
A: What is the Product Type of the product?
Q: The Product Type of the product is Audio IC Development Tools.
A: At what frequency does the Factory Pack Quantity?
Q: The product Factory Pack Quantity is 1.
A: Is the cutoff frequency of the product Subcategory?
Q: Yes, the product's Subcategory is indeed Development Tools