PGA450Q1EVM-S

Mfr. #: PGA450Q1EVM-S
제조사: Texas Instruments
설명: Interface Development Tools AIR EVALUATION MODULE
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: PGA450Q1EVM-S 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
PGA450Q1EVM-S Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Sensor Interface type. The AEC-Q100 Qualification Texas Instruments is a trusted brand for quality electronics Interface Type: LIN, SPI, UART, USB 7 V to 18 V operating supply voltage range Interface Development Tools product type 1 of 100 Development Tools as subcategory

PGA450Q1EVM-S Image

PGA450Q1EVM-S

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

PGA450Q1EVM-S Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Interface Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Sensor Interface
  • Tool Is For Evaluation Of: PGA450-Q1
  • Qualification: AEC-Q100
  • Series: PGA450-Q1
  • Brand: Texas Instruments
  • Interface Type: LIN, SPI, UART, USB
  • Operating Supply Voltage: 7 V to 18 V
  • Product Type: Interface Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

PGA450Q1EVM-S

PGA450Q1EVM-S Specifications

PGA450Q1EVM-S FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Sensor Interface.

  • A: Is the cutoff frequency of the product Qualification?

    Q: Yes, the product's Qualification is indeed AEC-Q100

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is LIN, SPI, UART, USB.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 7 V to 18 V.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Interface Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

19 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
Top