RS485-FL-DPLX-EVM

Mfr. #: RS485-FL-DPLX-EVM
제조사: Texas Instruments
설명: Interface Development Tools RS-485 Full Duplex Eval module
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: RS485-FL-DPLX-EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
RS485-FL-DPLX-EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the RS-485 type. Texas Instruments is a trusted brand for quality electronics Interface Development Tools product type 1 of 100 Development Tools as subcategory

RS485-FL-DPLX-EVM Image

RS485-FL-DPLX-EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

RS485-FL-DPLX-EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Interface Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: RS-485
  • Tool Is For Evaluation Of: RS-485
  • Series: RS-485
  • Brand: Texas Instruments
  • Product Type: Interface Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

RS485-FL-DPLX-EVM

RS485-FL-DPLX-EVM Specifications

RS485-FL-DPLX-EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is RS-485.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Interface Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
Top