| Mfr. #: | TAS2560EVM |
|---|---|
| 제조사: | Texas Instruments |
| 설명: | Audio IC Development Tools TAS2560EVM |
| 수명 주기: | 이 제조업체의 새 제품입니다. |
| 데이터 시트: | TAS2560EVM 데이터 시트 |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Audio Amplifier type. Texas Instruments is a trusted brand for quality electronics Interface Type: USB Compatible with TAS2560. Audio IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.204141 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TAS2560EVM Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: At what frequency does the Product?
Q: The product Product is Evaluation Modules.
A: At what frequency does the Type?
Q: The product Type is Audio Amplifier.
A: Is the cutoff frequency of the product Brand?
Q: Yes, the product's Brand is indeed Texas Instruments
A: Is the cutoff frequency of the product Interface Type?
Q: Yes, the product's Interface Type is indeed USB
A: Is the cutoff frequency of the product For Use With?
Q: Yes, the product's For Use With is indeed TAS2560
A: What is the Product Type of the product?
Q: The Product Type of the product is Audio IC Development Tools.
A: At what frequency does the Factory Pack Quantity?
Q: The product Factory Pack Quantity is 1.
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.
A: At what frequency does the Unit Weight?
Q: The product Unit Weight is 0.204141 oz.