TDC7201-ZAX-EVM

Mfr. #: TDC7201-ZAX-EVM
제조사: Texas Instruments
설명: Data Conversion IC Development Tools TIME TO DIGITAL CONVERTER FOR LIDAR
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: TDC7201-ZAX-EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TDC7201-ZAX-EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Time to Digital type. Texas Instruments is a trusted brand for quality electronics Compatible with TDC7201. Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.192222 oz of Unit Weight

TDC7201-ZAX-EVM Image

TDC7201-ZAX-EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TDC7201-ZAX-EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Time to Digital
  • Tool Is For Evaluation Of: TDC7201
  • Series: TDC7201
  • Brand: Texas Instruments
  • For Use With: TDC7201
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.192222 oz

TDC7201-ZAX-EVM

TDC7201-ZAX-EVM Specifications

TDC7201-ZAX-EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Time to Digital.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the For Use With of the product?

    Q: The For Use With of the product is TDC7201.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Data Conversion IC Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 0.192222 oz.

24 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
Top