THS4271EVM

Mfr. #: THS4271EVM
제조사: Texas Instruments
설명: Amplifier IC Development Tools THS4271 Eval Mod
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: THS4271EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
THS4271EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the High Speed Amplifiers type. 4.5 V to 15 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Amplifier IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 6.256014 oz of Unit Weight

THS4271EVM Image

THS4271EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

THS4271EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Amplifier IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: High Speed Amplifiers
  • Tool Is For Evaluation Of: THS4271
  • Operating Supply Voltage: 4.5 V to 15 V
  • Series: THS4271
  • Brand: Texas Instruments
  • Product Type: Amplifier IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 6.256014 oz

THS4271EVM

THS4271EVM Specifications

THS4271EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed High Speed Amplifiers

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 4.5 V to 15 V.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Amplifier IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 6.256014 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
Top