TLV320AIC23EVM2

Mfr. #: TLV320AIC23EVM2
제조사: Texas Instruments
설명: Audio IC Development Tools TLV320AIC23 Stereo aud Codec
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: TLV320AIC23EVM2 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TLV320AIC23EVM2 Overview

This product is manufactured by Texas Instruments. This device belongs to the Audio type. Texas Instruments is a trusted brand for quality electronics Audio IC Development Tools product type 1 of 100 Development Tools as subcategory

TLV320AIC23EVM2 Image

TLV320AIC23EVM2

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TLV320AIC23EVM2 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: N
  • Type: Audio
  • Tool Is For Evaluation Of: TLV320AIC23
  • Brand: Texas Instruments
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TLV320AIC23EVM2

TLV320AIC23EVM2 Specifications

TLV320AIC23EVM2 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Type?

    Q: The product Type is Audio.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Audio IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
Top