TLV62084EVM-828

Mfr. #: TLV62084EVM-828
제조사: Texas Instruments
설명: Power Management IC Development Tools EVM OF TLV62084DSG
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: TLV62084EVM-828 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TLV62084EVM-828 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Regulators - Switching Regulators type. 2.7 V to 6 V Input Voltage Output Voltage is 1.2 V Output current: 2 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.044447 oz of Unit Weight

TLV62084EVM-828 Image

TLV62084EVM-828

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TLV62084EVM-828 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: TLV62084
  • Input Voltage: 2.7 V to 6 V
  • Output Voltage: 1.2 V
  • Output Current: 2 A
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.044447 oz

TLV62084EVM-828

TLV62084EVM-828 Specifications

TLV62084EVM-828 FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Voltage Regulators - Switching Regulators

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 2.7 V to 6 V.

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 1.2 V.

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 2 A

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.044447 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
Top