TMP107EVM

Mfr. #: TMP107EVM
제조사: Texas Instruments
설명: Temperature Sensor Development Tools TMP107EVM
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: TMP107EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TMP107EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Temperature Sensor type. 3.3 V, 5 V operating supply voltage range Bulk packaging for easy dispensing Texas Instruments is a trusted brand for quality electronics Interface Type: 1-Wire, UART Temperature Sensor Development Tools product type 1 of 100 Development Tools as subcategory

TMP107EVM Image

TMP107EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP107EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Temperature Sensor Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Temperature Sensor
  • Tool Is For Evaluation Of: TMP107
  • Operating Supply Voltage: 3.3 V, 5 V
  • Packaging: Bulk
  • Description/Function: TMP107 evaluation module
  • Series: TMP107
  • Brand: Texas Instruments
  • Interface Type: 1-Wire, UART
  • Product Type: Temperature Sensor Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TMP107EVM

TMP107EVM Specifications

TMP107EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Temperature Sensor

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 3.3 V, 5 V.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is 1-Wire, UART.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Temperature Sensor Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
Top