TPL0501EVM

Mfr. #: TPL0501EVM
제조사: Texas Instruments
설명: Digital Potentiometer Development Tools TPL0501 EVAL MOD
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: TPL0501EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPL0501EVM Overview

This product is manufactured by Texas Instruments. Evaluation Kits 5.5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Compatible with TPL0501. Digital Potentiometer Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.043032 oz of Unit Weight

TPL0501EVM Image

TPL0501EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPL0501EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Digital Potentiometer Development Tools
  • RoHS: E
  • Product: Evaluation Kits
  • Operating Supply Voltage: 5.5 V
  • Series: TPL0501
  • Brand: Texas Instruments
  • For Use With: TPL0501
  • Product Type: Digital Potentiometer Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.043032 oz

TPL0501EVM

TPL0501EVM Specifications

TPL0501EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Kits.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 5.5 V.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product For Use With?

    Q: Yes, the product's For Use With is indeed TPL0501

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Digital Potentiometer Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.043032 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
Top