TPS2068EVM-292

Mfr. #: TPS2068EVM-292
제조사: Texas Instruments
설명: Switch IC Development Tools TPS2068EVM-292 Eval Mod
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: TPS2068EVM-292 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS2068EVM-292 Overview

This product is manufactured by Texas Instruments. Texas Instruments is a trusted brand for quality electronics Switch IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS2068EVM-292 Image

TPS2068EVM-292

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS2068EVM-292 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Switch IC Development Tools
  • RoHS: N
  • Tool Is For Evaluation Of: TPS2068DGN
  • Brand: Texas Instruments
  • Product Type: Switch IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS2068EVM-292

TPS2068EVM-292 Specifications

TPS2068EVM-292 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Switch IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
Top