| Mfr. #: | TPS22958EVM |
|---|---|
| 제조사: | Texas Instruments |
| 설명: | Power Management IC Development Tools TPS22958EVM |
| 수명 주기: | 이 제조업체의 새 제품입니다. |
| 데이터 시트: | TPS22958EVM 데이터 시트 |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Load Switches type. 600 mV to 5.5 V Input Voltage Output Voltage is 5.5 V Bulk packaging for easy dispensing Output current: 4 A/6 A Texas Instruments is a trusted brand for quality electronics The product can operate at a maximum temperature of + 105 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.046056 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS22958EVM Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: At what frequency does the Product?
Q: The product Product is Evaluation Modules.
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed Load Switches
A: At what frequency does the Input Voltage?
Q: The product Input Voltage is 600 mV to 5.5 V.
A: Is the cutoff frequency of the product Output Voltage?
Q: Yes, the product's Output Voltage is indeed 5.5 V
A: At what frequency does the Packaging?
Q: The product Packaging is Bulk.
A: Is the cutoff frequency of the product Output Current?
Q: Yes, the product's Output Current is indeed 4 A/6 A
A: What is the Brand of the product?
Q: The Brand of the product is Texas Instruments.
A: Is the cutoff frequency of the product Maximum Operating Temperature?
Q: Yes, the product's Maximum Operating Temperature is indeed + 105 C
A: At what frequency does the Minimum Operating Temperature?
Q: The product Minimum Operating Temperature is - 40 C.
A: At what frequency does the Product Type?
Q: The product Product Type is Power Management IC Development Tools.
A: What is the Factory Pack Quantity of the product?
Q: The Factory Pack Quantity of the product is 1.
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.
A: Is the cutoff frequency of the product Unit Weight?
Q: Yes, the product's Unit Weight is indeed 0.046056 oz