TPS2554EVM-010

Mfr. #: TPS2554EVM-010
제조사: Texas Instruments
설명: Power Management IC Development Tools TPS2554 Eval Mod
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: TPS2554EVM-010 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS2554EVM-010 Overview

This product is manufactured by Texas Instruments. Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS2554EVM-010 Image

TPS2554EVM-010

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS2554EVM-010 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: E
  • Tool Is For Evaluation Of: TPS2554
  • Description/Function: Evaluation Board
  • Series: TPS2554
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS2554EVM-010

TPS2554EVM-010 Specifications

TPS2554EVM-010 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
Top