| Mfr. #: | TPS40090EVM-001 |
|---|---|
| 제조사: | Texas Instruments |
| 설명: | Power Management IC Development Tools TPS40090-001 Eval Mod |
| 수명 주기: | 이 제조업체의 새 제품입니다. |
| 데이터 시트: | TPS40090EVM-001 데이터 시트 |


This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Switching Controllers type. 12 V Input Voltage Output Voltage is 1.5 V Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS40090EVM-001 Specifications
A: At what frequency does the Manufacturer?
Q: The product Manufacturer is Texas Instruments.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Boards.
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed Switching Controllers
A: What is the Input Voltage of the product?
Q: The Input Voltage of the product is 12 V.
A: At what frequency does the Output Voltage?
Q: The product Output Voltage is 1.5 V.
A: Is the cutoff frequency of the product Brand?
Q: Yes, the product's Brand is indeed Texas Instruments
A: Is the cutoff frequency of the product Product Type?
Q: Yes, the product's Product Type is indeed Power Management IC Development Tools
A: At what frequency does the Factory Pack Quantity?
Q: The product Factory Pack Quantity is 1.
A: Is the cutoff frequency of the product Subcategory?
Q: Yes, the product's Subcategory is indeed Development Tools