TPS53127EVM-614

Mfr. #: TPS53127EVM-614
제조사: Texas Instruments
설명: Power Management IC Development Tools TPS53127 Eval Mod
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: TPS53127EVM-614 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS53127EVM-614 Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Switching Controllers type. Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS53127EVM-614 Image

TPS53127EVM-614

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS53127EVM-614 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: E
  • Product: Evaluation Boards
  • Type: Switching Controllers
  • Tool Is For Evaluation Of: TPS5312
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS53127EVM-614

TPS53127EVM-614 Specifications

TPS53127EVM-614 FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: At what frequency does the Type?

    Q: The product Type is Switching Controllers.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
Top