TPS54331EVM-232

Mfr. #: TPS54331EVM-232
제조사: Texas Instruments
설명: Power Management IC Development Tools SWIFT Cnvrtr Eval Mod
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: TPS54331EVM-232 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS54331EVM-232 Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Voltage Regulators - Switching Regulators type. 15 V Input Voltage Output Voltage is 3.3 V Dimensions of 76.2 mm x 76.2 mm Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 5.808034 oz of Unit Weight

TPS54331EVM-232 Image

TPS54331EVM-232

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS54331EVM-232 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: E
  • Product: Evaluation Boards
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: TPS54331
  • Input Voltage: 15 V
  • Output Voltage: 3.3 V
  • Dimensions: 76.2 mm x 76.2 mm
  • Series: TPS54331
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 5.808034 oz

TPS54331EVM-232

TPS54331EVM-232 Specifications

TPS54331EVM-232 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is Voltage Regulators - Switching Regulators.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 15 V.

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 3.3 V

  • A: What is the Dimensions of the product?

    Q: The Dimensions of the product is 76.2 mm x 76.2 mm.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 5.808034 oz.

23 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
Top