TPS54360EVM-182

Mfr. #: TPS54360EVM-182
제조사: Texas Instruments
설명: Power Management IC Development Tools TPS54360 EVAL MOD
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: TPS54360EVM-182 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS54360EVM-182 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Power Management Specialized type. 60 V Input Voltage Output Voltage is 5 V Output current: 3.5 A Texas Instruments is a trusted brand for quality electronics Compatible with TPS54360. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS54360EVM-182 Image

TPS54360EVM-182

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS54360EVM-182 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: Power Management Specialized
  • Tool Is For Evaluation Of: TPS54360
  • Input Voltage: 60 V
  • Output Voltage: 5 V
  • Description/Function: Evaluation module is a fully assembled and tested circuit for evaluating the TPS54360 60V Input, 3.5A, Step-Down Converter with Eco-Mode
  • Output Current: 3.5 A
  • Series: TPS54360
  • Brand: Texas Instruments
  • For Use With: TPS54360
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS54360EVM-182

TPS54360EVM-182 Specifications

TPS54360EVM-182 FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Power Management Specialized.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 60 V.

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 5 V.

  • A: At what frequency does the Output Current?

    Q: The product Output Current is 3.5 A.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the For Use With?

    Q: The product For Use With is TPS54360.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

18 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
Top