TPS54388EVM

Mfr. #: TPS54388EVM
제조사: Texas Instruments
설명: Power Management IC Development Tools TPS54388 EVAL MOD
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: TPS54388EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS54388EVM Overview

This product is manufactured by Texas Instruments. Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory The product's SWIFT is Blue Gecko.

TPS54388EVM Image

TPS54388EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS54388EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Series: TPS54388
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Tradename: SWIFT

TPS54388EVM

TPS54388EVM Specifications

TPS54388EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: Is the cutoff frequency of the product Tradename?

    Q: Yes, the product's Tradename is indeed SWIFT

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
Top