TPS61322EVM-001

Mfr. #: TPS61322EVM-001
제조사: Texas Instruments
설명: Power Management IC Development Tools TPS61322EVM-001
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: TPS61322EVM-001 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS61322EVM-001 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Regulators - Switching Regulators type. 1.2 V Input Voltage Output Voltage is 2.2 V Bulk packaging for easy dispensing Texas Instruments is a trusted brand for quality electronics Compatible with Single Buck Controller with adaptive On-Time D-CAP Mode Control. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS61322EVM-001 Image

TPS61322EVM-001

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS61322EVM-001 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: TPS61322
  • Input Voltage: 1.2 V
  • Output Voltage: 2.2 V
  • Packaging: Bulk
  • Description/Function: Synchronous Boost Converter Evaluation Module
  • Series: TPS61322DBZ
  • Brand: Texas Instruments
  • For Use With: Single Buck Controller with adaptive On-Time D-CAP Mode Control
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS61322EVM-001

TPS61322EVM-001 Specifications

TPS61322EVM-001 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Voltage Regulators - Switching Regulators.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 1.2 V.

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 2.2 V

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the For Use With?

    Q: The product For Use With is Single Buck Controller with adaptive On-Time D-CAP Mode Control.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
Top