TPS65276EVM

Mfr. #: TPS65276EVM
제조사: Texas Instruments
설명: Power Management IC Development Tools TPS65276 EVAL MOD
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: TPS65276EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS65276EVM Overview

This product is manufactured by Texas Instruments. Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.347773 oz of Unit Weight

TPS65276EVM Image

TPS65276EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS65276EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Series: TPS65276
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.347773 oz

TPS65276EVM

TPS65276EVM Specifications

TPS65276EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.347773 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
Top