TPS65810EVM

Mfr. #: TPS65810EVM
제조사: Texas Instruments
설명: Power Management IC Development Tools TPS65810 Eval Mod
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: TPS65810EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS65810EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the PMIC Solutions type. 5 V Input Voltage Dimensions of 101.6 mm x 76.2 mm Texas Instruments is a trusted brand for quality electronics The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS65810EVM Image

TPS65810EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS65810EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Boards
  • Type: PMIC Solutions
  • Tool Is For Evaluation Of: TPS65810
  • Input Voltage: 5 V
  • Dimensions: 101.6 mm x 76.2 mm
  • Brand: Texas Instruments
  • Maximum Operating Temperature: + 85 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS65810EVM

TPS65810EVM Specifications

TPS65810EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is PMIC Solutions.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 5 V.

  • A: At what frequency does the Dimensions?

    Q: The product Dimensions is 101.6 mm x 76.2 mm.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Maximum Operating Temperature?

    Q: The product Maximum Operating Temperature is + 85 C.

  • A: Is the cutoff frequency of the product Minimum Operating Temperature?

    Q: Yes, the product's Minimum Operating Temperature is indeed - 40 C

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
Top