TPS7A8801EVM-776

Mfr. #: TPS7A8801EVM-776
제조사: Texas Instruments
설명: Power Management IC Development Tools TPS7A8801EVM-776
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: TPS7A8801EVM-776 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS7A8801EVM-776 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the LDO Voltage Regulators type. 1.4 V to 6.5 V Input Voltage Output Voltage is 50 mV, 100 mV, 200 mV, 400 mV, 800 mV, 1.6 V Output current: 1 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.005067 oz of Unit Weight

TPS7A8801EVM-776 Image

TPS7A8801EVM-776

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS7A8801EVM-776 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: LDO Voltage Regulators
  • Tool Is For Evaluation Of: TPS7A8801
  • Input Voltage: 1.4 V to 6.5 V
  • Output Voltage: 50 mV, 100 mV, 200 mV, 400 mV, 800 mV, 1.6 V
  • Output Current: 1 A
  • Series: TPS7A88
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.005067 oz

TPS7A8801EVM-776

TPS7A8801EVM-776 Specifications

TPS7A8801EVM-776 FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is LDO Voltage Regulators.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 1.4 V to 6.5 V.

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 50 mV, 100 mV, 200 mV, 400 mV, 800 mV, 1.6 V.

  • A: At what frequency does the Output Current?

    Q: The product Output Current is 1 A.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: Is the cutoff frequency of the product Unit Weight?

    Q: Yes, the product's Unit Weight is indeed 0.005067 oz

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
Top