| Mfr. #: | TPS7B6701EVM |
|---|---|
| 제조사: | Texas Instruments |
| 설명: | Power Management IC Development Tools TPS7B6701 EVAL MOD |
| 수명 주기: | 이 제조업체의 새 제품입니다. |
| 데이터 시트: | TPS7B6701EVM 데이터 시트 |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the LDO Voltage Regulators type. 4 V to 40 V Input Voltage Output Voltage is 1.5 to 18 V Output current: 450 mA Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS7B6701EVM Specifications
A: At what frequency does the Manufacturer?
Q: The product Manufacturer is Texas Instruments.
A: At what frequency does the Product?
Q: The product Product is Evaluation Modules.
A: At what frequency does the Type?
Q: The product Type is LDO Voltage Regulators.
A: At what frequency does the Input Voltage?
Q: The product Input Voltage is 4 V to 40 V.
A: What is the Output Voltage of the product?
Q: The Output Voltage of the product is 1.5 to 18 V.
A: What is the Output Current of the product?
Q: The Output Current of the product is 450 mA.
A: Is the cutoff frequency of the product Brand?
Q: Yes, the product's Brand is indeed Texas Instruments
A: What is the Product Type of the product?
Q: The Product Type of the product is Power Management IC Development Tools.
A: Is the cutoff frequency of the product Factory Pack Quantity?
Q: Yes, the product's Factory Pack Quantity is indeed 1
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.