TS3DV642EVM

Mfr. #: TS3DV642EVM
제조사: Texas Instruments
설명: Power Management IC Development Tools TS3DV642 EVAL MOD
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: TS3DV642EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TS3DV642EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Power Distributions type. Texas Instruments is a trusted brand for quality electronics Compatible with TS3DV642. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.014280 oz of Unit Weight

TS3DV642EVM Image

TS3DV642EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TS3DV642EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Power Distributions
  • Tool Is For Evaluation Of: TS3DV642
  • Description/Function: An evaluation module for the Texas Instruments 1:2 multiplexer and demultiplexer high-bandwidth HDMI switch
  • Series: TS3DV642
  • Brand: Texas Instruments
  • For Use With: TS3DV642
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.014280 oz

TS3DV642EVM

TS3DV642EVM Specifications

TS3DV642EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Power Distributions.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product For Use With?

    Q: Yes, the product's For Use With is indeed TS3DV642

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.014280 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
Top