TSW3100EVM

Mfr. #: TSW3100EVM
제조사: Texas Instruments
설명: Data Conversion IC Development Tools TSW3100 Pattern Gen Mod
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: TSW3100EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TSW3100EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the DAC type. 1.8 V to 3.3 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: Ethernet, USB Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

TSW3100EVM Image

TSW3100EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSW3100EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • Shipping Restrictions:
  • RoHS: N
  • Product: Evaluation Boards
  • Type: DAC
  • Tool Is For Evaluation Of: DAC29x, DAC56x
  • Operating Supply Voltage: 1.8 V to 3.3 V
  • Brand: Texas Instruments
  • Interface Type: Ethernet, USB
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TSW3100EVM

TSW3100EVM Specifications

TSW3100EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed DAC

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 1.8 V to 3.3 V

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is Ethernet, USB.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Data Conversion IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
Top