TUSB542EVM

Mfr. #: TUSB542EVM
제조사: Texas Instruments
설명: Interface Development Tools TUSB542EVM
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: TUSB542EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TUSB542EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the USB type. Texas Instruments is a trusted brand for quality electronics 1.8 V operating supply voltage range Interface Development Tools product type 1 of 100 Development Tools as subcategory The product's USB Type-C is Blue Gecko.

TUSB542EVM Image

TUSB542EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TUSB542EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Interface Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: USB
  • Tool Is For Evaluation Of: TUSB542
  • Description/Function: TUSB542 USB type-c 5Gbps redriver 2:1 MUX
  • Series: TUSB542
  • Brand: Texas Instruments
  • Operating Supply Voltage: 1.8 V
  • Product Type: Interface Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Tradename: USB Type-C

TUSB542EVM

TUSB542EVM Specifications

TUSB542EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is USB.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 1.8 V

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Interface Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: Is the cutoff frequency of the product Tradename?

    Q: Yes, the product's Tradename is indeed USB Type-C

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
Top