| Mfr. #: | UCC20520EVM-286 |
|---|---|
| 제조사: | Texas Instruments |
| 설명: | Power Management IC Development Tools Evaluation Module |
| 수명 주기: | 이 제조업체의 새 제품입니다. |
| 데이터 시트: | UCC20520EVM-286 데이터 시트 |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Gate Drivers type. 3 V to 18 V Input Voltage Output Voltage is 9.2 V to 25 V Output current: 4 A, 6 A Texas Instruments is a trusted brand for quality electronics The product can operate at a maximum temperature of + 125 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

UCC20520EVM-286 Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: At what frequency does the Product?
Q: The product Product is Evaluation Modules.
A: What is the Type of the product?
Q: The Type of the product is Gate Drivers.
A: At what frequency does the Input Voltage?
Q: The product Input Voltage is 3 V to 18 V.
A: What is the Output Voltage of the product?
Q: The Output Voltage of the product is 9.2 V to 25 V.
A: Is the cutoff frequency of the product Output Current?
Q: Yes, the product's Output Current is indeed 4 A, 6 A
A: Is the cutoff frequency of the product Brand?
Q: Yes, the product's Brand is indeed Texas Instruments
A: What is the Maximum Operating Temperature of the product?
Q: The Maximum Operating Temperature of the product is + 125 C.
A: What is the Minimum Operating Temperature of the product?
Q: The Minimum Operating Temperature of the product is - 40 C.
A: What is the Product Type of the product?
Q: The Product Type of the product is Power Management IC Development Tools.
A: At what frequency does the Factory Pack Quantity?
Q: The product Factory Pack Quantity is 1.
A: Is the cutoff frequency of the product Subcategory?
Q: Yes, the product's Subcategory is indeed Development Tools